Preparations are rapidly underway in Kazakhstan, which is hosting EXPO 2017 that left behind 161 countries, including Brazil, Canada, and Russia, in the secret ballot held by the International Exhibitions Bureau in Paris, the capital of France on 22 November 2012.
It is estimated that in 2017, Kazakhstan’s capital city, Astana, will attract dozens of international associations with at least 5 million visitors from more than 100 countries. After the FIFA World Cup and the Olympic Games, the third biggest event in the world, the EXPO 2017, has created new venues for business and recreation, new airports, a new exhibition area and a new railway station in Astana.
New access to the intersection of ancient silk roads
The construction of the new Astana International Railway Station, which forms a critical junction on ancient silk roads, stands at the middle of Europe-Asia highways and will serve as a bridge for Kazakhstan’s capital city; The project is entrusted to Sembol Construction which attracted attention with its successful works in Kazakhstan.
At the crossroads of railway, highway and metro lines, at the crossroads of the main roads of the city, as well as being a major transportation center, the train station which is projected as a special meeting point that attracts attention with its wavy architecture; It is expected to be used by 35.000 people a day during the EXPO.
Sembol Construction, undertaking the construction of the project, will bulid on a total area of 106 thousand square meters which 75 thousand square meter of it will house the building ; As a solution partner waterproofing of the project, HYFIX Chemical Waterproofing Systems was chosen by Sembol Construction.
The project was designed by the famous British architect Sir Norman Foster with whom we has also worked as a solution partner in the waterwaterproofing of KHAN SHATYR – Han Tent, which was opened in 2010 as the world ‘s largest tent in Kazakhstan’ s capital city Astana.
In the city of Astana, which is the 2nd coolest capital in the world, where the summer and winter temperature difference is between 70-80 degrees; HYFIX Chemical Waterproofing Systems was chosen because it provides maximum savings in time due to its ability to be applied in harsh weather conditions, offers the most effective and guaranteed solution against corrosion with its seamless and tear-free application and water impermeability values.


Turkish



